The kit arrives, all 50 pounds of it! The box is perfectly packed. There isn't one square inch of space left!
|
32 individual sheets of plywood, die cut pieces |
|
Silk Screened Windows |
|
4000 Cedar Shingles |
|
The Work Area |
This is the first area I set up in. I built the first floor and foundation on this table but I found that it was awkward working at the table.
|
Foundation |
A friend suggested working at a shorter table with casters so it
could be turned around easily so I asked my ever helpful hubby if he had
such a thing. Lo and behold, the exact thing arrives in the house. It's
a little steel tube work table on casters that he made. My hubby is a skilled metal fabricator. Comes in handy around here sometimes ;)
I don't have a photo of the table right now but you'll see it soon enough in this blog.
|
Front Door Step |
|
The foundation with the first floor in place |
Well that's it for the foundation and first floor. Onto the next part of the assembly; stair cases.
No comments:
Post a Comment